Nodes preparation

The S2 nodes that will be installed shall be:

  • marked with a label with Radio Net ID and Node ID,

  • programmed with a correct firmware version using S2 BLU Programmer,

  • their Radio Net ID and Node ID must be set using S2 Init Nodetool.

Last updated